Project Overview
Electrical installation works were carried out at Single Living Accommodation (SLA) facilities in Helensburgh, involving the installation of multiple switchboards and associated power infrastructure.
The scope included cable pulling, termination, and full connection of incoming and outgoing circuits to ensure reliable distribution throughout the accommodation buildings. All circuits were installed and tested in accordance with electrical standards, including continuity, insulation resistance, and polarity verification. Protective devices, earthing, and bonding arrangements were checked to confirm full compliance and safe operation.
Switchboards and associated plant were safely lifted and positioned using a telehandler and qualified slinger, ensuring secure installation and adherence to site safety procedures throughout the works.
Electrical & Cabling Services Delivered
- Installation of multiple switchboards within SLA facility
- Cable pulling and termination of incoming and outgoing circuits
- Connection to power supplies and distribution infrastructure
- Testing of circuits for continuity, insulation resistance, and polarity
- Verification of protective devices, earthing, and bonding
- Safe lifting and positioning using telehandler and slinger
- Compliance with electrical standards and site safety protocols
Project Outcome
The switchboards were successfully installed and commissioned, providing safe and reliable power distribution within the accommodation facility. The works were completed in accordance with electrical standards and site safety requirements, ensuring a compliant and robust installation ready for operational use.