Ballymena Waste Water Treatment Works

Advanced Cabling Contractors completed cable installation works for a solar farm at Ballymena WWTW, installing power and control cabling via ducted and trench routes with full termination and testing.

  • Solar Farm Cabling
  • SWA Power Installation
  • Duct & Trench Routing
Ballymena Waste Water Treatment Works

Project Overview

This project involved a solar farm installation within Ballymena WWTW. AEG Cable Contractors installed multiple cables to the inverters over a significant distance. The cables were installed using a winch system, then fully glanded, terminated, and tested upon completion. Additional SWA and Cat 6 SWA cables were installed to the main switch room to support the PV installation.

The installation utilised a combination of existing duct infrastructure and newly excavated open trench. All excavation works were carried out by our own team.

Cabling Services Delivered

  • Installation of power cables to inverter units
  • Installation of cabling to main switch room
  • Cable pulling using 1.5-tonne 110V winch system
  • Installation via existing duct infrastructure and newly excavated trench routes
  • Glanding and termination of all installed cables
  • Electrical testing and verification
  • Coordination with Advanced Civils for trench excavation works

Project Outcome

The solar farm cabling installation was successfully completed, providing reliable power and communication links between inverter systems and the main switch room. The works were delivered safely and efficiently within a live utility environment, supporting renewable energy integration at the Ballymena treatment facility.